Search This Blog

Showing posts with label Ffestiniog. Show all posts
Showing posts with label Ffestiniog. Show all posts

Thursday, 9 May 2013

Welsh Highland Railway

In a nutshell

Gauge:         1' 11½"

Length:       25 miles

Opened:      1863 - extended 1923 - closed 1937 - re-opened in phases from 1997 to 2011

Location:

    
View Narrow Gauge Railways in a larger map
View Narrow Gauge Railways in a larger map

 

Date of visit: 6 May 2013

 

Key Facts

  • The first part of what is now the Welsh Highland Railway was opened in 1863. This was the horse-drawn Croesor Tramway which ran from Porthmadog to the Croesor Valley. This has now been incorporated into southern part of the railway.
  • In 1877, the North Wales Narrow Gauge Railway opened a line from Dinas Junction on the LNWR mainline to the south of Caernarfon, initially to Snowdon Ranger and then in 1881 to Rhyd Ddu.
  • In 1923, the Welsh Highland Railway was completed with the link from Rhyd Ddu, through Beddgelert and the Aberglaslyn Pass to link up with the Croesor Tramway.
  • The Depression years of the 1920s was not the most lucrative time to open a new railway and from its inception the WHR struggled financially.
  • The railway limped on until it was put into receivership in 1927 and closing in 1933 when it was leased to the Festiniog Railway Company. The FR tried to make the railway successful through development of the tourist trade but was eventually forced to abandon the railway in 1937 when the it was closed and the stock and track sold off.
  • The restoration of the railway was mired in controversy with both the Welsh Highland Heritage Railway and the Festiniog Railway initially seeking to purchase the trackbed and gain funding to reopen the line. Eventually, the Ffestiniog Railway was successful and through National Lottery funding was able to rebuild and reopen the railway in stages from 1997 to 2011.
  • Restoration began with the completion of the railway from Caernarfon to Dinas along the trackbed of the former standard gauge railway.
  • The final phase of construction was the completion of the link from the WHR, through the town of Portmadog to the Ffestiniog Railway station which entailed the re-installation of the crossing over the standard gauge railway near to the Welsh Highland Heritage Railway station.
  • The original WHR inherited two locomotives from its constituent companies; a single Fairlie locomotive, Moel Tryfan, which survived until 1954 when it was scrapped by the FR; and a 2-6-2T Hunslet locomotive, Russell, which is owned by the Welsh Highland Heritage Railway and is currently undergoing restoration by Alan Keef Ltd. The line also bought an ex War Dept Baldwin locomotive which did not prove to be successful or popular with crews on the railway.
  • The railway now uses a fleet of Beyer-Peacock Garratt articulated locomotives to tackle the tortuous, steeply inclined route. Most of the locos are from South Africa, but the line also possesses a former Tasmanian Railways K class locomotive which was the world's first Garratt articulated loco and
  • The line also has a fleet of diesel locomotives
  • From time to time Ffestiniog Railway locomotives haul trains along the line as they did when the line was first opened
  • The Welsh Highland Heritage Railway also has opportunities to run special trains on the railway, as part of an agreement between the two railways when restoration began. 

Route

Source: http://www.railway-technology.com/projects/welshhighlandrailway/

My Impressions

This was not the first time I had travelled along or visited the Welsh Highland Railway. I was fortunate enough to travel on the first public train through the Aberglaslyn Pass in May 2009, though for some reason I took only one photo to commemorate this auspicious event!


My visit on this occasion was as part of a visit to the Ffestiniog Railway's 150th anniversay celebrations when I took the opportunity to take a ride on the WHR as a respite from the events on the FR.

Prior to my trip on the railway, I took some lineside shots in the Aberglaslyn Pass. Mainly, I wanted to see the two ex-Penrhyn Hunslet locomotives, Blanche and Linda, hauling a special FR/WHR train non-stop from Blaenau to Caernarfon.

The following day, I travelled the line from Porthmadog to Rhyd Ddu, which I consider to be the most spectacular part of the railway. Mind you, the section from Rhyd Ddu to Waunfawr also has its attractions but it was more convenient for me to change trains at Rhyd Ddu.

Before boarding the train, I was able to watch our loco running round and taking on water at Harbour Station.

 Because the tracks at Harbour Station are not yet aligned for the WHR, trains have to be hauled out from the platform by a pilot loco before the WHR loco is then attached to take the train across the bridge and through the town.
WHR Beyer Peacock loco 138 negotiates the road bridge at Porthmadog
The station platforms at Harbour Station are presently being remodelled and so from Spring 2014, this interesting reverse manoeuvre will no longer be necessary.

The first part of the railway is unspectacular as the line crosses the farmland which was reclaimed from the salt flats when the Cob across the estuary was built in 1811 by William Maddocks who gave his name to the town of Porthmadog (Maddock's Port).

Before long, however, the train starts its ascent towards Beddgelert. Shortly after leaving Nantmor, the train plunges into a 280m long tunnel ......

 ...... before emerging into the Aberglaslyn Pass, where the railway clings to the hillside on a ledge above the river and passes through a further two short tunnels.

After crossing the river on a girder bridge the railway begins a steep climb through woodland towards Beddgelert Station which is located above a short way above the town.

 After taking on water, the train started the next and most tortuous stage of the railway's climb up gradients of up to 1:40 and taking in a series of S-bends to enable it to gain height.

Adapted from: http://web.bethere.co.uk/steven.harris/twa/std/images/map07.gif

Towards the end of the climb, the railway emerges from the woodland to cross some heathland and begin its descent towards Rhyd Ddu on the lower slopes of Snowdon. On this particular occasion, this marked the end of my journey and I waited on the platform for the arrival of the train from Caernarfon.

On the journey back, there was an opportunity to wait at Beddgelert for the arrival of a special train from Porthmadog, hauled by one of the Ffestiniog Railway's stalwart 0-4-0 England locomotive, Palmerston.

We passed once more through the woodland below Beddgelert .........

........ and through the Aberglaslyn Pass.

Before entering the town of Porthmadog once more, we passed the link with the Welsh Highland Heritage Railway. ........

 ...... before crossing the standard gauge Cambrian Coast Railway ......

...... and then winding our way across the back of the town. We then negotiated the road crossing over Britannia Bridge and was pulled back into Harbour Station by one of the FR's ex Penrhyn Railway locomotives, Linda.


The Welsh Highland Railway is certainly one of the most spectacular of the preserved narrow gauge railways in the UK. As it is now connected to the Ffestiniog Railway the two now boast around 40 miles of continuous railway from Caernarfon to Blaenau Ffestiniog. It is possible on gala days such as this to travel the entire length of the railway non-stop (apart from when the locomotives have to take on water). Personally, I prefer to do the trip in stages as it provides opportunities for me to take lineside pictures. However, if you have not yet had the opportunity to travel on and/or view the railway as it passes through the Aberglaslyn Pass, then it must surely rank as one of the must-see stretches of narrow gauge railway in the country.

I will return! It's about time I traversed the northern end of the railway and gathered a few more lineside shots. Hopefully I'll do that sometime in the summer and can then complete the video of the journeys.

Video

[In preparation] 


Saturday, 9 March 2013

Progress Report 3




I had quite a busy summer visiting as many railways as I could. I tended to focus initially on those in North Wales as many could be visited in a day from my home in Cheshire and also I wanted to make the most of my Great Little Trains of Wales discount card.



The railways in Wales visited since my last progress report include:

In addition, I have ventured into Staffordshire to visit




A brief trip to East Anglia (where I spent my formative years) provided an opportunity to visit






A visit to the West country for a family event enabled a visit to
Whilst a trip to Bridgnorth gave an opportunity to ride on the


A couple of  forays into Lancashire and Yorkshire led to visits to



and a flying visit to the Wye Valley resulted in visits to




I have been surprised at the number of railways which lie within the reach of a day visit, though the number of these is inevitably beginning to diminish. I have realised that the most productive visits are those which coincide with gala days as these provide more opportunities for photos and videos. However, this is dependent on my availability on those particular days.

Having now visited several 15" gauge railways, I have come to appreciate the historical significance of this gauge to the history of the narrow gauge in this country. The more I found out, the more I wanted to know and as a consequence I've blogged the results of my researches so far -  see The 15" Minimum Gauge Railways - a Chronology.



One of the things which has struck me during my travels is the enduring appeal of steam railways for most people. My trip on the Ffestiniog was taken during the February half term holiday and the train was packed - mostly with parents and young children. However, there was also a fair smattering of older couples. Similarly, even on a cold Saturday morning in February, the train at Windmill Farm was full.


My tour of the route of the Lynton & Barnstaple happened by chance. We were spending a weekend helping a friend celebrate a particularly special birthday in holiday let not far from Barnstaple and a half day became available for me to set off on my own to trace the route of the railway. It was extremely fortunate that the weather was very kind considering it was January. Having never visited the railway before, I now know the lie of the land and when I revisit the area to travel on the railway at Woody Bay, I will be able to fill in some of the gaps along the line caused by pressure of time (eg Snapper Halt, Parracombe and Wistlandpound). I was very impressed with the location for the railway and also by the enthusiasm and dedication of the enthusiasts I came across who were working on restoring the line. Mind you, this has been so with all those I've encountered on the railways visited so far - including some teenage volunteers on the Kirklees Light Railway who did much to restore my faith in the youth of today.

My intentions for this coming season are to complete my visits to the Welsh Narrow Gauge Railways and also to visit some of the railways which are open for limited days in the year (eg the Statfold Barn Railway, the Eaton Railway). I'd also like to spend a few days in Cumbria and maybe also visit the North East to take in some of their railways - but all this is speculative at this stage. I'd really like to visit the Isle of Man and Ireland - but maybe that will have to wait until another year as it looks like our holiday plans have already been finalised for this year.